ВУЗ: Не указан
Категория: Не указан
Дисциплина: Не указана
Добавлен: 22.11.2019
Просмотров: 4651
Скачиваний: 5

NAV 46/WP.3
ANNEX
Page 91
.4
Operating cargo handling equipment and hatches
.1
Open all hatches before loading / unloading.
.2
Are the cranes / derricks operational?
.2.1
Yes, the cranes / derricks are operational.
.2.2
No, the cranes / derricks are not operational (yet).
.2.3
The
cranes / derricks will be operational in ... minutes.
.3
Rig the derrick(s) / crane(s) of no. ... hold(s).
.4
Check the preventers.
.5
Keep the safe working load of derrick(s) / crane(s).
.6
Instruct the winchmen / cranemen .
.7
Clean the tween deck(s) before opening lower hold(s).
.8
Switch on / off
the hold ventilation.
.9
Switch on / off the hold lights.
.10
Close / open the cargo port(s) to no. ... hold(s).
.5
Maintaining / repairing cargo handling equipment
.1
Check the hold(s) / hatch cover(s) / derrick(s) / ... for damage and report.
.1.1
The
hold(s) / hatch cover(s) / derrick(s) / ... is / are
in order.
.1.2
The
cargo battens are damaged.
.1.3
The
rubber seals of the hatch cover(s) are
damaged.
.1.4
The
preventer(s) of no. ... hold(s) is / are damaged.
.1.5
The
(Container) lashings are
damaged.
.1.6
... is / are
damaged.
.1.6.1
Replace the damaged ... .
.2
The
hold ladder(s) is / are
bent.
.2.1
Straighten the hold ladder(s).
.3
Are the hold ventilators operational?
.3.1
Yes, the hold ventilators are operational.
.3.2
No, the hold ventilators are not operational (yet).
.3.3
The
hold ventilators will be
operational in ... minutes.
.4
Are the winch motors operational?
.4.1
Yes, the winch motors
are operational.
.4.2
No, the winch motor of no. ... derrick is
not operational (yet).
.4.3
The
winch motor of no. ... derrick will be
operational in ... minutes.
.5
Check the repair works personally.
.6
Briefing on stowing and securing
.1
Check the
~ careful and safe stowage.
~ complete unloading.
~ proper use of handling gear.
~ careful separation of different lots.
.2
Close the hatches in case of rain / snow / ... .
.3
Refuse damaged / crushed / renailed /wet /torn/ resewn / ...
boxes / cartons / cases /crates / bags / ... .
.4
Do not overstow cartons with other goods ... .
.5
Do not use hooks for handling bags.
.6
Stow ventilation ducts into the bag cargo.
.7
Place dunnage between the tiers.
.8
Stow the

NAV 46/WP.3
ANNEX
Page 92
~ ... into tween deck of no. ... hold.
~ pallets / cartons / ... closely together.
~ ... in reefer hold.
~ empty containers in topmost tiers .
~ container(s) onto hatch cover(s).
~ ... .
.9
Check the
~ containers for damage.
~ correct interlock of the stowpieces.
~ correct fixing of the rope clips.
~ ... .
.10
Secure the heavy lift(s) immediately .
.11
Relash all lashings.
B3/1.2 Handling dangerous goods
Also see IMO-IMDG Code, London 1994, as revised.
.1
Briefing on nature of dangerous goods
.1
What is the IMO-Class of these goods?
.1.1
The
IMO-Class of these goods is: ... .
.2
This package contains IMO - Class ... goods.
.3
These goods are flammable / poisonous / ... .
.3.1
Handle these goods with caution.
.4
These goods emit flammable gases in contact with water.
.4.1
Keep these goods dry.
.5
These goods are liable to spontaneous heating and combustion.
.6
Do not touch ... .
.2
Instructions on compatibility and stowage
.1
Observe the IMDG-Code when loading / stowing.
.2
Check the
~ proper segregation of goods.
~ correct technical names in documents.
~ correct marks / labels.
~ compatibility of IMO-Class ... goods.
.3
Stow IMO-Class ... goods
~ away from living quarters / away from ... .
~ separated (by one hold) from IMO-Class ... goods.
~ under / on deck.
.3.1
Cover IMO-Class ... goods on deck with tarpaulins / ... .
.4
Stow
~ flammable goods away from the engine room bulkhead / ... .
~ infectious substances separated by one hold / compartment from foodstuffs.
~ ... drums away from IMO-Class ... goods at a minimum of ... metres.
.5
Brief the stevedores on the dangerous goods in number ... hold(s).
.6
Refuse damaged / wet / ... packings with dangerous goods.
.7
Ventilate the hold(s) before entering.
.8
Load / unload IMO-Class ... goods first.
.9
No smoking during loading / unloading.

NAV 46/WP.3
ANNEX
Page 93
.3
Reporting incidents
.1
Sling(s) with bottles / drums / ... of IMO-Class ... goods were
dropped on deck /
into no. ... hold / on pier ... .
.1.1
Liquid / powder / gas is
spilling.
.2
Several drums / barrels / tanks / ... are
deformed ( and leaking).
.3
The ... container with IMO-Class ... goods is spilling out of the door.
.4
Spilling substances of IMO - Class ... escaped into the sea / harbour water
.4.1
Inform the pollution control.
.5
Temperature in locker / container/ ... with IMO-Class ... goods is
increasing (rapidly).
.6
Orange / red / ... smoke is developing from IMO-Class ... goods (on deck).
.7
Explosion in no. ... hold.
.7.1
Damage to gas tank / container /....
.8
Minor / major fire in number ... hold.
.8.1
Fire extinguished.
.8.2
IMO-Class ... goods re-ignited.
.8.3
Fire under control.
.8.4
Fire not under control (yet).
.8.4.1
Operate the general emergency alarm.
.8.4.2
Alarm the harbour fire brigade / ... .
.9
Report injured persons / casualties.
.9.1
No person injured.
.9.2
Number of injured persons / casualties is ... .
.4
Action in case of incidents
.1
Take actions according to the Emergency Plan.
.2
Turn the vessel out of the wind – the spilling gas / smoke is toxic.
.3
Put on protective clothing and breathing apparatus.
.4
Stop the spillage.
.5
Let the spillage evaporate.
.6
Remove the spillage with synthetic scoops.
.6.1
Use absorbents for the spillage.
.6.2
Do not touch the spillage.
.7
Separate contaminated goods from other goods.
.8
Cover contaminated goods with tarpaulins / ... .
.9
Only open the container / hold / locker / ... when smoking is stopped.
.10
Cool down the container/ ... with water.
.11
Ventilate the hold(s) carefully.
.12
Close the hatch - operate the fire extinguishing system.
.13
Fight the fire from a great distance.
.14
Flood no. .. hold(s).
.15
Rescue persons.
.15.1
Take injured persons / casualties to a safe area.
.15.2
Provide first aid to injured persons / casualties.
.15.3
Call the ambulance.
.16
Take off and dispose contaminated clothing.
.17
Alter course for the nearest port ( - inform on radio).

NAV 46/WP.3
ANNEX
Page 94
B3/1.3 Handling liquid goods, bunkers and ballast - pollution prevention
.1
Preparing safety measures
.1
Plug the scuppers / drip-trays and report.
.1.1
All scuppers / drip-trays are plugged.
.2
Close the sea-valves / discharges and report.
.2.1
All sea-valves / discharges are closed.
.3
Stand by absorbent materials and report.
.3.1
Absorbent materials standing by.
.4
Stand by spill control gear and report.
.4.1
Spill control gear standing by.
.5
Stand by emergency fire pump / foam monitor / fire extinguishers and report.
.5.1
Emergency fire pump / foam monitor / fire extinguishers standing by.
.6
Fit bonding wire and report.
.6.1
Bonding wire is fitted.
.7
Maintain contact on VHF Channels ... with the bunker barge / oil terminal.
.8
Is the oil pollution prevention plan available ?
.8.1
Yes, the oil pollution prevention plan is
available.
.8.2
No, the oil pollution prevention plan is
not available (yet).
.8.3
The oil pollution prevention plan will be
available in ... minutes.
.9
Instruct the pumpman / ... and report.
.9.1
Pumpman / ... is instructed.
.2
Operating pumping equipment
including: phrases for communication with bunker barge / oil terminal
.1
What is the (maximum) loading rate / discharge rate ?
.1.1
The
(Maximum) loading rate / discharge rate is: ... tonnes per hour.
.2
Is the COW - system / inert gas system operational ?
.2.1
Yes, the COW - system / inert gas system is
operational .
.2.2
No, the COW - system / inert gas system is not operational (yet).
.2.3
The
COW - system / inert gas will be
operational in ... minutes.
.3
When will crude oil washing start ?
.3.1
Crude oil washing will start in ... minutes.
.4
Are your tanks inerted?
.4.1
Yes, my tanks are inerted.
.4.2
No, my tanks are not inerted (yet).
.4.3
My tanks will be inerted in ... minutes.
.5
What is the pressure in the inerted tanks?
.5.1
The
pressure in the inerted tanks is ... bar.
.6
What is the pumping pressure ?
.6.1
The
pumping pressure is ... bar.
.7
Can we connect the loading arm ?
.7.1
Yes, you can connect the loading arm.
.7.2
No, you cannot connect the loading arm (yet).
.7.3
Connect the loading arm in ... minutes.
.8
Inform ... minutes before loading / discharge will start / finish.
.8.1
Loading / discharge will start / finish in ... minutes.
.9
What is the back pressure for stripping ?
.9.1
The
backpressure for stripping is... bars.

NAV 46/WP.3
ANNEX
Page 95
.10
Are the cargo hoses / booms connected ?
.10.1
Yes, the cargo hoses / booms are
connected.
.10.2
No, the cargo hoses / booms are
not connected (yet).
.10.3
The
cargo hoses / booms will be
connected in ... minutes.
.11
Are the cargo hoses / booms disconnected ?
.11.1
Yes, the cargo hoses / booms are disconnected.
.11.2
No, the cargo hoses / booms are
not disconnected (yet).
.11.3
The
cargo hoses / booms will be disconnected in ... minutes.
.12
Are you ready to load /discharge?
.12.1
Yes, I am ready to load / discharge.
.12.2
No, I am not ready to load /discharge (yet).
.12.3
I will be ready to load / discharge in ... minutes.
.13
Keep a safe working pressure.
.14
Open the valve(s) and report.
.14.1
All full open aboard / ashore.
.15
Close the valve(s) and report.
.15.1
All full closed aboard / ashore.
.16
Start pumping (slowly).
.17
Are you pumping / receiving ?
.17.1
Yes, I am pumping / receiving.
.17.2
No, I am not pumping / not receiving.
.18
Increase / decrease pumping rate to ... revolutions / bar..
.19
(Quantity received) - stop pumping.
.3
Reporting and cleaning up spillage
.1
Leak at manifold connection!
.1.1
Overflow at ... !
.2
Stop pumping !
.3
How much is spilled ?
.3.1
Spill is about ... tonne(s).
.4
Treat spill with ... .
.5
Stand by oil clearance team and report.
.5.1
Oil clearance team standing by.
.5.2
All crew assist to remove the spill.
.5.4.1
Spillage stopped.
.5.4.2
Spill cleaned up.
.5.4.3
Spill waste contained in save-all/… .
.6
Oil / ... escaping into sea / harbour water!
.6.1
Inform pollution control!
.4
Ballast handling
.1
Plug the scuppers and report.
.1.1
All scuppers are plugged.
.2
Open / close the sea suction valve / ballast tank valve no. ... and report.
.2.1
Sea suction valve / ballast tank valve no. ... is open / closed.
.3
Start the ballast pump and report.
.3.1
Ballast pump started.
.4
Stop the ballast pump (- ballast overflow!) and report.
.4.1
Ballast pump stopped.