Файл: Учебное пособие по курсу Иностранный язык Казань 2007 удк 804. 37. 022 М90 Мулюков И. М., И. А. Абдуллин Английский язык для технических специальностей Учебное пособие для студентов технических вузов. Казань Казан гос энерг унт, 2007.doc

ВУЗ: Не указан

Категория: Не указан

Дисциплина: Не указана

Добавлен: 22.11.2023

Просмотров: 411

Скачиваний: 14

ВНИМАНИЕ! Если данный файл нарушает Ваши авторские права, то обязательно сообщите нам.
Many variations of the basic process are practiced. Metallurgists have discovered that the change from austenite to martensite occurs during the latter part of the cooling period and that this change is accompanied by a change in volume that may crack the metal if the cooling is too swift. Three comparatively new processes have been developed to avoid cracking. In time-quenching the steel is withdrawn from the quenching bath when it has reached the temperature at which the martensite begins to form, and is then cooled slowly in air. In martempering the steel is withdrawn from the quench at the same point, and is then placed in a constant-temperature bath until it attains a uniform temperature throughout its cross section. The steel is then allowed to cool in air through the temperature range of martensite formation, which for most steels is the range from about 288° C to room temperature. In austempering the steel is quenched in a bath of metal or salt maintained at the constant temperature at which the desired structural change occurs and is held in this bath until the change is complete before being subjected to the final cooling.

Other methods of heat treating steel to harden it are used. In case hardening, a finished piece of steel is given an extremely hard surface by heating it with carbon or nitrogen compounds. These compounds react with the steel, either raising the carbon content or forming nitrides in its surface layer. In carburizing, the piece is heated in charcoal or coke, or in carbonaceous gases such as methane or carbon monoxide. Cyaniding consists of hardening in a bath of molten cyanide salt to form both carbides and nitrides. In nitriding, steels of special composition are hardened by heating them in ammonia gas to form alloy nitrides.


Unit 4


Text A


Building Construction


Building Construction is a procedures involved in the erection of various types of structures. The major trend in present-day construction continues away from handcrafting at the building site and toward on-site assembly of ever larger, more integrated subassemblies manufactured away from the site.

Another characteristic of contemporary building, related to the latter trend, is the greater amount of dimensional coordination; that is, buildings are designed and components manufactured in multiples of a standard module (10 cm being standard in the U.S.), which drastically reduces the amount of cutting and fitting required on the building site. A third trend is the production or redevelopment of such large structural complexes as shopping centers, entire campuses, and whole towns or sections of cities.
Words and expressions

structure - строение, здание, сооружение

construction - стройка, строительство; конструкция,

сооружение

assembly - монтаж, сборка

site - местоположение; строительный участок,

стройплощадка

dimensional coordination - приведение данных размеров к общей системе

координат
Exercise 1

Ответьте на следующие вопросы:

  1. How do we call procedures involved in the erection of various types of structures?

  2. What is the difference between handcrafting at the building site and on-site assembly of prefabricated parts?

  3. What later trend characteristic of contemporary building do you know?

  4. What is the advantage of the building components manufactured in multiples?

  5. What innovation in the construction industry drastically reduces the amount of cutting and fitting on the building site?

  6. Is it common in present day construction industry production and redevelopment of huge projects? Name some of such huge projects.

  7. What is the difference between production and redevelopment in construction industry?

  8. How do you understand the procedure of redevelopment of whole towns and sections of cities?


Exercise 2

Заполните пропуски недостающими по смыслу словами, используя текст:


  1. The procedure of the erection of various types of structures is called … .

  2. The major trend in present-day construction continues away from … at the building site.

  3. On-site assembly of larger, more integrated … manufactured away from the site is one of the major trends in construction industry today.

  4. Another characteristic of contemporary building is the greater amount of … coordination.

  5. Dimensional coordination means that buildings are designed and components manufactured in … of a standard module.

  6. … drastically reduces the amount of cutting and fitting required on the building site.

  7. Third major trend in contemporary building is the production or redevelopment of … complexes.


Exercise 3

Соответствуют ли данные предложения содержанию текста:


  1. Building Construction is a procedure involved in the erection of continuous production lines.

  2. The major characteristics in present-day construction is handcrafting at the building site.

  3. Larger, more integrated subassemblies manufactured are usually manufactured at construction site.

  4. Another characteristic of 19-th century building construction was the greater amount of dimensional coordination.

  5. Application of dimensional coordination means that buildings are designed and components manufactured in multiples of a standard module.

  6. Dimensional coordination drastically increases the amount of cutting and fitting on the building site.

  7. An important present day characteristic in the construction industry is the production or redevelopment of large structural complexes.

  8. Large structural complexes include: hospitals, schools, kindergartens and shops.



Exercise 4

Используя текст, составьте высказывания с данными словами и выражениями:

building construction – erection – structure - major trend - present-day construction – handcrafting - building site - on-site assembly - integrated subassemblies - dimensional coordination - standard module – cutting – redevelopment - structural complex - section of a city.

Exercise 5

Кратко передайте содержание каждого абзаца.
Exercise 6

Выделите пять основных идей текста.
Exercise 7

Составьте предложения, используя данные выражения:

fabricated structure (сборная конструкция); framed structure (каркасная конструкция); hydraulic structure (гидротехническое сооружение); rigid structure (жесткая конструкция); improper assembly (неправильная сборка); building site (стройплощадка); common multiple (общее кратное).
Exercise 8

Переведите на русский язык следующие предложения:


  1. Building construction is an ancient human activity.

  2. Constructed shelters were one means by which human beings were able to adapt themselves to a wide variety of climates and become a global species.

  3. The history of building is marked by a number of trends.

  4. Early building materials were perishable, such as leaves, branches, and animal hides.

  5. The present state of building construction is complex.

  6. There is a wide range of building products and systems which are aimed primarily at groups of building types or markets.

  7. The design process for buildings is highly organized.

  8. The construction process includes the manufacturers of building products and systems and the craftsmen who assemble them on the building site.

  9. Building construction today is a significant part of industrial culture.



Exercise 9

Переведите на английский язык:


  1. В современной России строительная индустрия занимает одно из ведущих мест в промышленности.

  2. Основной характеристикой современного строительства является ее высокая механизация.

  3. Строительные организации занимаются монтажом различных типов конструкций.

  4. Объемы ручного труда на строительстве с каждым годом уменьшаются.

  5. Крупные и интегрированные детали для строительства изготавливаются на специализированных предприятиях.

  6. Размерная координация направлена на ускорение строительства объектов.

  7. Подгонка и сварка на строительстве занимают большое количество рабочего времени и человеческих ресурсов.

  8. В последние годы появилась тенденция строительства или реконструкции крупных структурных комплексов.

  9. Крупным структурным строительным комплексом является строительство жилого комплекса «Солнечный Город».


Exercise 10

Текст на самостоятельный перевод:

Construction

Building construction is an ancient human activity. It began with the purely functional need for a controlled environment to moderate the effects of climate. Constructed shelters were one means by which human beings were able to adapt themselves to a wide variety of climates and become a global species.


Human shelters were at first very simple and perhaps lasted only a few days or months. Over time, however, even temporary structures evolved into such highly refined forms as the igloo. Gradually more durable structures began to appear, particularly after the advent of agriculture, when people began to stay in one place for long periods. The first shelters were dwellings, but later other functions, such as food storage and ceremony, were housed in separate buildings. Some structures began to have symbolic as well as functional value, marking the beginning of the distinction between architecture and building.

The history of building is marked by a number of trends. One is the increasing durability of the materials used. Early building materials were perishable, such as leaves, branches, and animal hides. Later, more durable natural materials—such as clay, stone, and timber—and, finally, synthetic materials—such as brick, concrete, metals, and plastics—were used. Another is a quest for buildings of ever greater height and span; this was made possible by the development of stronger materials and by knowledge of how materials behave and how to exploit them to greater advantage. A third major trend involves the degree of control exercised over the interior environment of buildings: increasingly precise regulation of air temperature, light and sound levels, humidity, odors, air speed, and other factors that affect human comfort has been possible. Yet another trend is the change in energy available to the construction process, starting with human muscle power and developing toward the powerful machinery used today.

The present state of building construction is complex. There is a wide range of building products and systems which are aimed primarily at groups of building types or markets. The design process for buildings is highly organized and draws upon research establishments that study material properties and performance, code officials who adopt and enforce safety standards, and design professionals who determine user needs and design a building to meet those needs. The construction process is also highly organized; it includes the manufacturers of building products and systems, the craftsmen who assemble them on the building site, the contractors who employ and coordinate the work of the craftsmen, and consultants who specialize in such aspects as construction management, quality control, and insurance.

Building construction today is a significant part of industrial culture, a manifestation of its diversity and complexity and a measure of its mastery of natural forces, which can produce a widely varied built environment to serve the diverse needs of society.

Text B

Construction Industry

Building construction is the product of a diverse group of subindustries, with many individuals and organizations involved in the construction of a single structure, from the manufacture of necessary components to final assembly. As a general rule, state laws require a registered architect or engineer, or both, to execute the design and to make sure that the design complies with public health, zoning, and building-code requirements. The design must at the same time conform to the requirements of the owner. The architect or engineer converts these requirements into a set of drawings and written specifications that usually are sent to interested general contractors for bids. The successful bidder or bidders in turn subcontract plumbing, painting, electrical wiring, structural frame construction and erection, and other jobs to firms specializing in these crafts.

Contractors ordinarily carry out their work under the observation of an architect and or engineer, who acts as agent of the owner. State and local inspectors review the work for general compliance with the local building code. The immediate responsibility of the contractor, architect, and engineer ends when the local authorities approve the building for occupancy and the owner accepts the building. However, the contractor, architect, and engineer are legally responsible for any deficiencies in the construction or design for a period of several years after acceptance, the time depending on the terms of the contract and local laws.
Words and expressions

Building - строительство

construction - стройка, строительство;


конструкция, сооружение

structure - строение, здание, сооружение;

конструкция, структура

terms of the contract - условия контракта

Exercise 1

Ответьте на следующие вопросы:

  1. Is building construction a product of a diverse group of sub industries, with many individuals and organizations involved?

  2. What industries are engaged in the manufacture of necessary components for construction and final assembly of buildings?

  3. Do State laws in Russia require a registered architect or engineer to execute the design?

  4. Who is responsible for making the design to comply with public health, zoning, and building-code requirements?

  5. Are owners’ requirements taken into consideration by city council authorities?

  6. Who is responsible to make the design to conform to the requirements of the owner?

  7. What are the next steps taken after a set of drawings and written specifications ready?

  8. Who usually perform plumbing, painting, electrical wiring, structural frame construction and erection, and other jobs after the design is approved?

  9. Under whose observation the contractors ordinarily carry out their work?

  10. When does the immediate responsibility of the contractor, architect, and engineer end?

  11. Who are legally responsible for any deficiencies in the construction or design for a period of several years after acceptance?

Exercise 2

Заполните пропуски недостающими по смыслу словами, используя текст:

  1. Building construction is the product of a diverse group of … .

  2. In building construction many … and … are involved in the construction of a single structure.

  3. The design is usually executed by a registered … and … .

  4. The design should … with public health, zoning, and building-code requirements.

  5. The … must conform to the requirements of the owner.

  6. Drawings and written specifications are converted into a set of … and … .

  7. Contractors carry out their work under the observation of an … and … .

  8. Construction inspectors review the work for general compliance with the local … .

  9. Contractor, architect, and … are legally responsible for any defects in the construction or design.


Exercise 3

Соответствуют ли данные предложения содержанию текста:

  1. Building construction is the product of a single group of construction industry.

  2. Building construction involves final assembly only.

  3. As a general rule, state laws permit to execute the design to any company engaged in manufacturing of building materials.

  4. Any building construction design should comply with public health, zoning, and building-code requirements.

  5. The design must conform to the requirements of the architect.

  6. The owner of a building converts requirements of local authorities into a set of drawings and written specifications.

  7. The architect and the engineer subcontract construction and erection jobs to firms specializing in these crafts.

  8. Contractors carry out their work under the observation of an architect and an engineer.

  9. State and local inspectors review the work for general compliance with the local building code.

  10. The contractor, architect, and engineer are legally responsible for any financial difficulties of the owner during the construction period.


Exercise 4

Используя текст, составьте высказывания с данными словами и выражениями:

Building construction - single structure - manufacture of components - final assembly - general rule - state laws - registered architect - building-code requirements – to conform to - to subcontract - to act as an agent - to review the work - to be legally responsible for – to depend on - terms of the contract.

Exercise 5

Кратко передайте содержание каждого абзаца.
Exercise 6