PLANNED RESULTS OF THE DEVELOPMENT OF THE PLO/OPOP

SYMBOLS AND ABBREVIATIONS

Introduction

1 Chapter

Areas applications quantities density flow radon

Climatology. Radon - as a tracer of air exchangeprocesses

Static and dynamic methods measurements

Chapter

Dynamics of radon activity and its decay products inside the storage chamber

Conclusion on the chapter The field of β-radiation at depths of 0.5 and 1 m quite well reflects the dynamics of the radon subsoil field, the daily variation is well traced. However, the daily course of the β-field in some periods has a shift compared to the daily course of the radon field, i.e. the time of the onset of the maximum in the dynamics of the β-field is ahead/late by several hours.The dynamics of RA of radon in soil air at the same depth, but at a distance of 1.5–2 m, can differ significantly. The maxima in the daily course of RA of radon at different depths occur at different times, at a depth of 0.5 m - approximately at 16-18 hours, and at a depth of 1 m - at 24 hours. The delay in some periods reaches 8 hours.Correlation analysis between the radon field and meteorological values revealed only a significant relationship with the amount of rainfall.A 2-month experiment on the calibration of β- and α-radiation detectors installed in wells did not make it possible to unambiguously determine the correction factors for converting to units of volumetric activity. As a result, it was decided to conduct a second experiment with some adjustment of the experimental design, as well as refinement of the VA detector installation scheme. The requirements for the conditions for calibrating the readings of the VA detector in units of RA of radon are as follows: Wells with VA detectors installed inside should not be opened during calibration, i.e. tubes for pumping air from the well, which are cyclically connected to the radon radiometer, should be installed at least a day before the start of the experiment. The VA detectors should not be removed from the well or moved in the well during calibration, as this leads to a distortion of the time series of data. To calculate the coefficient of decrease in the range of diurnal variations after the start of pumping air from the well, it is necessary to record data from the VA detector at least a week before the start of the experiment, and after its completion. The development of the project infrastructure made it possible to analyze the results of the calibration of soil detectors by 0.5 and 1 мusing a radon radiometer, which showed the following:at depth, 0,5 мthe temporal changes in the α- and β-fields are practically synchronous, but have different amplitudes ;in the daily course of radon VA at different depths, the maxima at depth 0,5 мare recorded at 16–18 h, and at depth 1 мat 24 h; the delay in time of the moments of the onset of maxima in radon VA is

Chapter 4 Financial management, resource efficiency and resource saving

Consumer portrait

SWOT analysis

Project Initiation

Project Participants

Project Schedule

Scientific and technical research budget

Basic salary

Additional salary

Overhead costs

Conclusion

Social responsibility

Industrial safety

Artificial lighting

Electrical safety

Static electricity

Safety in emergencies

Conclusions to the section social security

List of sources used

application 1



Analyzing the SWOT-analysis table, we can say that the proposed set of activities has enough strengths and opportunities.

The main weakness is the dependence on third-party sources of information about the climatic conditions of the area.

At the same time, it is worth talking about the need for constant modernization of technologies and equipment. In addition, compliance with environmental legislation is an important task.

    1. 1   ...   10   11   12   13   14   15   16   17   ...   32

Project Initiation


The initiation process group consists of processes that are performed to define a new project or a new phase of an existing one. In the initiation processes, the initial purpose and content are determined and the initial financial resources are fixed. The internal and external stakeholders of the project who will interact and influence the overall result of the research project are determined.

      1. Project Stakeholders


Table 4.3 Stakeholders of the project


Project stakeholders

Stakeholder expectations


Tomsk Polytechnic University (TPU)

Supervision and approval of research work came from TPU. The acquired results can be used to calculate the dose rate of low gamma background radiation in the environment

when using scintillation detector (BDPA-01).


Radiation Safety Service

Development of a method for modeling of radon flux density based on current

atmospheric temperature



      1. Objectives and Outcomes of Project


Table 4.4 Purpose and results of the project



Purpose of project:

To investigate the effect climate changes such as temperature, pressure, air humidity on the readings

of flux density of radon in surface atmosphere

Expected results of the project:

– Creation of a model of radon flux density in the

surface atmosphere.




– Identification of seasonal patterns in the dynamics of radon SPR into the surface

atmosphere based on experimental data

Criteria for acceptance of the project result:

Validation of results by using the obtained model of flux density of radon with the experimental data.


Requirements for the project result:

Agreement between the results of project and the

results of other authors on similar works.

Industrial application. The results would help

conducting radiation monitoring in different industries.

Technical specification: To be able to calculate the correct flux density of radon an area with created

model based on climatic data.




      1. 1   ...   11   12   13   14   15   16   17   18   ...   32

Project Participants


The organizational structure of the project involves all participants or people who participated in the research work, the number of hours they spent and the roles they played in the research. In this research work, there were two participants.

Scientific supervisor Executor
Table 4.5 Structure of the project






Participant


Role in the project


Functions

Labor time, hours (working days (from

table 7) × 6 hours)

1

Scientific Supervisor A professor and a lecture of the

Nuclear Science and Technology

Head of project

Formulating of research topic and giving directions of how to achieve the

main aim. Ensuring that all task

48×6 = 288




department at TPU.




pertaining to the main objectives are done on time.

Verification of results obtained.




2

Executor A student of the Nuclear Science and Technology department at TPU.

Executor

Performing of task and researching of literature review. Collecting of data and analysing of results.

82×6 = 492



      1. Project limitations and Assumptions


Project limitations are all factors that can be as a restriction on the degree of freedom of the project team members.
Table 4.6 Project
limitations


Factors

Limitations / Assumptions

3.1. Project's budget, rubles

326500.74

3.1.1. Source of financing

TPU

3.2. Project timeline:

25/01/2023 to 25/05/2023

3.2.1. Date of approval of plan of project

25/01/2023

3.2.2. Completion date

25/05/2023